A 30 kW solar power plant is a complex of modern equipment and services for its installation and connection, aimed at meeting your own electricity needs and benefiting from the profitable sale of excess energy at the "green" tariff.

Instead of being constantly dependent on a supplier, you can independently generate all the electricity needed for your household, and the current size of the "green" tariff for private users makes the construction of a solar power plant one of the best investments!

Operation principle of a 30 kW solar power plant Such a solar power plant is grid-connected, which means it does not require the use of batteries, unlike standalone and hybrid systems. This makes it significantly cheaper and more accessible for users.

In general, the operation of a grid-connected solar power plant works as follows:

  1. Under the influence of sunlight, the panels comprising the photovoltaic array generate direct current (DC).

  2. The DC current is then fed to the grid-tied inverter through a special cable with a large cross-section and reliable insulation.

  3. The grid-tied inverter's role is not only to convert the incoming DC current into alternating current (AC) but also to optimize the performance of the solar panels for maximum generation.

  4. The DC current from the inverter is directed to the electricity meter and then into the main grid, ensuring high income for the owner of the solar power plant through the "green" tariff.

Although this operational scheme may seem straightforward, it requires a professionally responsible approach to the construction of the solar power plant and its initial setup. That is why when a turnkey 30 kW solar power plant is built, the price includes the calculation of a personalized project and the work of professional installers. The correct start of the solar power plant's operation is the key to its uninterrupted performance and high annual profits under the "green" tariff.

Considering the peculiarities of solar power plant operation, the correct orientation of the solar panels array is a prerequisite for achieving maximum electricity generation:

  1. By compass directions: It is understandable that the highest efficiency is achieved when solar panels face south. Therefore, there are cases where the roof is not the best option for installation, and the entire photovoltaic array is placed on ground-mounted structures.

  2. By tilt angle: The optimal tilt angle of solar panels is based on the latitude of the installation site and is determined individually, taking into account the client's needs for generation in different seasons. Usually, the roof's tilt angle does not exactly match the required values, so additional structures may be necessary to correct the situation.

How is a 30 kW solar power plant built? The construction and subsequent operation of any solar power plant, including a 30 kW system, involve several mandatory stages:

  1. Site inspection by a specialist: During the inspection, the initial equipment selection is adjusted, an installation plan is developed, and all necessary details are clarified.

  2. Commercial proposal: Based on the inspection results, a cost estimate is prepared, and calculations are made regarding profitability, generation, and expected payback periods.

  3. Installation of the entire equipment set: In addition to mounting solar panels and the inverter, this stage also includes the installation of protective grounding equipment and a trial run of the solar power plant after its connection.

  4. After successful commissioning, technical passports, warranty certificates, original certificates, and a single-line diagram of the connection are provided to the user.

  5. Free service maintenance is provided for a period specified in the contract after the station's commissioning.

Additionally, if needed and at the client's request, the following legal work may be included in the list for a separate fee:

  • Increasing the input power at a private house.

  • Restructuring contracts with the utility company (REMs).

  • Process of obtaining the "green" tariff.

By ordering a complete package of services, including legal assistance, you are guaranteed to save time on bureaucracy and receive a fully operational facility within a minimal timeframe.